Tasks and tags

3 min read12
Copy for AI:

Tasks and tags look like they solve the same thing and they solve opposite problems. A task goes one level down inside a project. A tag cuts across different projects. Understanding that difference means setting things up once instead of twice.

Tasks

Under Tasks β€Ί New task. Every task belongs to a project β€” that's the only required field besides the name. On Soap Factory's Rebranding, the tasks would be "Brand research", "Visual proposal" and "Brand manual".

  • Assignee β€” who's on it. With no assignee, the task sits in everyone's list.

  • Status β€” Open, In progress or Done.

  • Estimated hours β€” the expected size of the task, to compare later with what it really cost.

  • Due date β€” the agreed date.

  • Billable β€” inherits from the project and can differ here. Useful when a paid project has a goodwill workstream.

  • Description and Tags.

The task list has a Start timer action: it starts counting with project and task already filled in. It's the shortest path between deciding what to do and starting to measure.

Tracking hours without a task is allowed and common. The task is what gives your report detail β€” if you never need to know "how much did the visual proposal cost", you can live without them.

Who can create

Members can create and edit tasks, and that's deliberate: without it, nobody could track hours on anything an admin hadn't set up first. Creating a customer or a project, on the other hand, is a commercial decision and stays with admins and the account owner.

Tags

Under Tags β€Ί New tag. A tag has a name and a colour, and can be applied to projects and tasks. It exists to answer questions that cut across the whole portfolio:

  • How much time does the agency spend in meetings, across all clients?

  • Does design consume more hours than development this quarter?

  • How much did the work tagged as rework cost this year?

A few well-chosen tags beat thirty. Too many tags slice the report into small pieces and make everyone on the team tag differently.

One caveat in the tag report

When a piece of work has two tags, it appears on both report rows β€” and the sum of the rows exceeds the period total. That's not an error: the total at the top is still the correct number, and the screen warns you when it happens. Splitting the 3 hours into 1h30 for each tag would invent a number that exists on no entry at all.

What happens when you delete

Deleting a tag removes it from the projects and tasks it was applied to. The hours stay β€” what's lost is the ability to cross-cut by that label.

Where to go next

  • Customers and projects β€” the layer above tasks.

  • Timer and manual entry β€” tracking hours on a task.

  • Reports β€” where tags earn their keep.

  • Your team β€” what each role can create.


In short: a task goes one level down inside a project and can have an assignee, a due date and an estimate; a tag cuts across projects and serves to group types of work in the report. Members create tasks; customers and projects stay with admins. Use few tags, and be careful with the sum of rows when a piece of work has more than one.